A term often used to describe a project that undergoes much testing and revision. Most iterations take a sudden U-turn in flight and burst into flames and its back to the drawing board in attempts to achieve a stable design. Cost overruns and job turnover in this research model requires an extra level of management to justify the budget and maintain a PR department for damage control.